Building & Resources Development at GNS

New School Chairs – August 2021

2021

  • Development of a new meeting room
  • Astrouturf Pitch and Wall Ball
  • Extension of Room No. 1 (Junior and Senior Infants)
  • New Interactive Flat Panel installed in Classroom No. 2 and No. 5
  • New seats for all children
  •  

2020

  • External Building Painted
  • Safety Railing completed at the school entrance
  • New Interatcive Flatpanel installed in Classroom No. 3
  • Introduction of Dabbledoo Music Programme from Junior Infants to 6th Class
  • New Furniture for Room No. 1 (Junior & Senior Infants)

2019

  • Two new en-suite toilets completed in Classroom No.4
  • Two external doors created for Room No. 5 and Room No. 5 onto the school yard with associated ramp and safety railing.
  • Old styles at front gate blocked up and the layout re-configured
  • New Flower bed with signage ]
  • Reconfiguration of old classroom into our School Library and Special Ed. Room
  • Purchase of New Maths Resources IZAK 9
  • Robert Dunbar Memorial Library
  • School Garden Re-Landscaped
  • Built In Storage for Library and Room Number 4. New seating for Special Ed Rooms
  • Flooring and Painting

2018

  • 30 i-pads purchased

2017

  • Pelican Crossing completed outside the school
  • Re-positioning and Up-Grading of Electric Metre Board and Fuse Board

2016

  • All classrooms and school corridor painted

2014

  • Upgrading of School Heating System

2011

  • School Yard extended. Old water Tower Knocked. Teachers Car Park built.

2011

  • School Hall was built

1993

  • A fifth classroom was built ( Present 1st & 2nd Classroom)

1980

  • A fourth classroom and general purpose room were built. (Present Junior & Senior Infant Room)

1961

  • A third classroom was built (Present 5th & 6th Classroom

1947

  • Gortnahoe NS opened containing two classrooms – Present 3rd & 4th and Special Ed. Room